Skip to content

Eregli Iron and Steel Factory

Eregli Iron and Steel Works Co.

Eregli Iron and Steel Factory
Sector
Industrial Manufacturing
Location
Zonguldak, Türkiye
Capacity
44 kW
Duration
Ongoing
Year
2026
We provided a comprehensive air conditioning solution for one of Türkiye's largest integrated iron and steel plants.

Need

It was necessary to ensure the comfort of personnel working on production lines generating high temperatures and to cool sensitive equipment.

Solution

Four 11 kW NMAC units were installed and configured for uninterrupted 24/7 operation.

Result

Temperatures in production areas fell by 15 °C, staff productivity rose by 25% and equipment failures dropped by 40%. These figures are based on the customer's statement.
Newsletter

Get new products and promotions in your inbox

One or two emails a month at most. Unsubscribe with one click at any time. Past newsletters →